The difference is in our flush-frame connection design
Flush-frame connections from New Millennium feature a joist-reaction work point designed to occur at the centerline of the wide-flange girder. This eliminates girder torsion concerns during erection and/or due to final design loading of a perimeter wide-flange girder. Our published standards take advantage of this key design feature.
The project engineer of record (EOR) is solely responsible for the selection of appropriate connections between the joist and wide-flange girder. Our published standards may be used as-is or adapted by the project engineer of record (EOR) as appropriate to the specific project conditions.
